top of page

Kenya: Menengai geothermal development project

Objective

- To increase geothermal energy production capacity by 400 MW.

- To provide a reliable, clean and affordable electricity supply to 500,000 households and 300,000 micro-enterprises.

- To accelerate the energy transition of the Kenyan economy through increasing the proportion of geothermal in the national energy mix.

- To reduce the frequency of power outages caused by the volatility of hydroelectric production.


43 views0 comments

Recent Posts

See All

Comments


bottom of page