top of page

Côte d’Ivoire - (ESMP) CIPREL Expansion Project


CIPREL is located in Vridi, on the edge of lagoon, in the town of PortBouet. The 222MW

expansion will be installed on a site adjacent to the existing plant in the industrial area of Vridi dedicated to petroleum activities. The plant will have a minimum life of 200,000 hours, which corresponds to a lifetime of 25 years minimum. The evacuation of the power generated at 225 kV by this expansion will be made on a bay to equip the station 90/225 kV VRIDI Read more...

16 views0 comments

Recent Posts

See All

Comments


bottom of page